Q1:

The alternator is used in power plants which converts.......


 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q2:

The Da-Lavel impulse turbine is a........


 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q3:

The efficiency of chimney is approximately........


 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q4:

The main source of production of biogas is........


 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q5:

The primary sources of energy are........


 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q6:

In regenerative cycle feed water is heated by........


 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q7:

Fan is located in induced draught........


 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q8:

The draught which a chimney produces is called........


 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q9:

Space required of a steam power station........


 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q10:

The maximum length of a screw conveyer is about........


 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q11:

which of the following is not a requirement for site selection of hydroelectric power plant?
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q12:

Hydroelectric power plant is __________
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q13:

Hydroelectric power plant is mainly located in ____________
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q14:

Trash racks are built for ___________
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q15:

which statement about surge tank is wrong?
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q16:

The best capable alternative source which can meet the future energy demand is _____________
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q17:

Nuclear fuel in reactor lasts for ________________
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q18:

Cost of nuclear fuel in nuclear power plant economics is considered as __________
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q19:

With respect to the load centre which location is suitable for establishment of nuclear power plant?
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q20:

In nuclear power stations which nuclear reaction is performed?
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q21:

What is the advantage of sectionalizing of power plant?
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q22:

The area under the load curve represents ____________
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q23:

Load duration curve indicates _______
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q24:

Size and cost of installation depends upon ____________
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous
Options:
Q25:

Which of the following represents the annual average load?
 

Tags:
Kalsee_ME
Section:
ME Miscellaneous