github

Made bySaurav Hathi

[Elementary Learning] Quant - Time & Speed and Work & Wages-2

Q1:

A can do a piece of work in 12 days and B in 16 days. They began to work together but 4 days before the completion of the work A leaves. Find the number of days they worked together

Tags:
Section:
Quantitative Aptitude
Options:
Q2:

Aarav and Arnav start simultaneously from the same point on a circular track and run in opposite directions at speeds of 2.20 km/hr and 3.55 km/hr respectively. If the circumference of the track is 736 m, after how much time will they meet for the first time?

Tags:
Section:
Quantitative Aptitude
Options:
Q3:

Amit and Berry, who are separated by a distance 90 m, are approaching towards each other. The initial speed of Amit is 5 m/s and that of Berry is 10 m/s. If Amit increases his speed by 5 m/s every second, when will they meet each other?

Tags:
Section:
Quantitative Aptitude
Options:
Q4:

Amit can build a wall in 12 days. Anit can build the same wall in 16 days. Find the time taken by both Amit and Anit to build a wall which is half the length of the original wall.

Tags:
Section:
Quantitative Aptitude
Options:
Q5:

Kirti can complete 25% of a piece of work in 3 hrs. Rahul and Kirti can complete the whole work in 4 hrs. How much time (in hours) does Rahul require to complete 50% of that work? 

Tags:
Section:
Quantitative Aptitude
Options:
Q6:

A, B and C can complete a piece of work in 8, 12 and 24 days respectively. If A and B work on the first day, B and C work on the second day and A and C work on the third day and the same pattern continues 4th day onward, then in how many days will the work be completed?

Tags:
Section:
Quantitative Aptitude
Options:
Q7:

Amit is 1.5 times as fast as Bunny; Bunny is twice as fast as Curran, and Curran is 34   times as fast as Darren. If Darren covers a certain distance in 2 hours. Find the extra time taken by Curran as compared to Amit if they both travel the same distance.

Tags:
Section:
Quantitative Aptitude
Options:
Q8:

Find the length of the train travelling at 45 m/s, if it crosses a platform, 500 meter long in 18 second.

Tags:
Section:
Quantitative Aptitude
Options:
Q9:

Eight children and twelve women complete a certain piece of work in 9 days. If each child is half as efficient as a women, then in how many days will 12 women finish the same work?

Tags:
Section:
Quantitative Aptitude
Options:
Q10:

A and B start running simultaneously from the same point on a circular track with speeds 5 m/s and 15 m/s respectively. If they run in the opposite directions, find the ratio of the distances covered by them till their first meeting.

Tags:
Section:
Quantitative Aptitude
Options: